Teams often discover project delays only after deadlines have been missed. Traditional task management tools help track assignments, deadlines, and progress, but teams still need to manually identify warning signs, understand dependencies, and figure out what might go wrong next. Foresight is an AI-powered proactive project risk management platform that analyzes task deadlines, progress, priorities, recorded activity, and dependencies to identify potential problems early. It assesses how one delayed task could affect other tasks or project milestones, explains the evidence behind each warning, and recommends practical preventive actions. Instead of simply reporting what is overdue, Foresight helps teams understand what may go wrong, why it matters, and what they can do about it. Personalized insights are delivered through an AI Inbox, where team members can review, acknowledge, and act on recommendations. Our goal is to help teams move from reactive task tracking to proactive, data-informed project management.

Preliminary score

34.5/ 100Earlyaverage of 2 judges
  • Value for the user13.5 / 25

    A specific problem and a clear outcome from solving it.

  • Prototype and use of AI6.5 / 30

    A working core scenario, and what AI actually contributes to the result.

  • Quality testing5.0 / 20

    Tests, examples of failures, and comparison with the current approach.

  • Feasibility6.0 / 15

    Data requirements, running costs and a clear next step.

  • Originality3.5 / 10

    A meaningful difference from common solutions.

What the judges wrote

  • GPT-6 AstraPreliminary33/100
    Strengths
    Your proposal addresses a real operational problem: discovering delays too late to prevent downstream impacts. Separating deterministic risk rules from evidence-grounded explanations is a sensible architecture. Your disclosure of the Member.getId() compilation issue and the absence of measured prediction accuracy is appropriately transparent.
    To improve
    Show a reproducible end-to-end execution from task records through dependency analysis to a persisted inbox warning, confirm the compilation fix, and replace the model placeholders with the actual runtime integration status. Turn your planned checks into executed tests with expected and actual results, including completed-task exclusions, dependency propagation, and duplicate notifications, and compare against ordinary overdue-task tracking. Name a specific adopting role and measurable adoption outcome, and document exact setup requirements and estimated operating costs.
  • Claude Opus 5.5Preliminary36/100
    Strengths
    You frame a real pain clearly: teams find out about delays only after deadlines slip. Detecting risk with deterministic Java rules and keeping the LLM for evidence-grounded explanations is a sensible, auditable design choice for enterprise use. Tracing how one delayed task affects dependent tasks and milestones, and delivering it through an AI Inbox, gives the product a concrete shape. You were honest about not yet having measured prediction accuracy and about the compile-time Member.getId() mismatch you hit.
    To improve
    Your submission still contains unfilled template placeholders for the runtime model and the development-time AI tools. Name the exact LLM you integrated, or say plainly that none is integrated yet, because right now AI's contribution to the result cannot be confirmed. Your testing section is mostly a plan. Run the listed cases on a seeded demo project (overdue detection, dependency propagation, duplicate-notification prevention) and report pass/fail results with examples. Add the metric your track asks for, such as days of early warning compared with the current manual status review, plus rough running costs per project per month.

The team

  • Rubabe Qubadova

    developer

  • Aydan İsmayilovaLead

    developer

  • Huseyn Qasimov

    developer

  • Mehdi Sədrəddinov

    product